Skip To Main Content
A modern school hallway with purple seating and tables in the foreground, and large windows and a motivational mural in the background.
A construction site with a large building and a steel frame structure in the foreground is surrounded by trees and a clear sky in the background.
A construction site with a bulldozer in the foreground and a large building under construction with blue siding in the background.
A blue scissor lift is positioned under a white paneled overhang in the foreground of the left panel, while a modern street lamp stands beside a sidewalk leading to a building with parked vehicles in the background of the right panel.
A modern building with a slatted overhang in the foreground is under construction with a cloudy sky in the background.
In the foreground, desks are arranged in rows, while the background reveals a classroom with a projector screen and windows looking out onto trees.
A large, mature tree with Spanish moss stands in front of a modern building with a stone and metal facade, set against a clear blue sky.
A stone pillar and purple carpeted seating area with tables and chairs are in the foreground, while large windows reveal a bright outdoor scene with a building in the background.
A large purple and white mural with the words %22PATHWAY TO SUCCESS%22 is on the wall of a modern hallway with gray tiled lower walls and a view of an exit with greenery in the background.

Boerne High School Addition

The addition to the L wing of the campus now houses the district's second Pathway to Technical Early College High School program, Health Science. 6 multi-use academic classrooms, 2 science lab classrooms, and 2 nursing lab classrooms are part of the addition. Since opening that wing in 2025, around 20% of incoming 9th graders are enrolled in the Health Science program, which is housed at BHS and open to all high school students.

Project Specifications

  • Expanded classroom capacity
    • 19,600 sq. ft.
    • 10 classrooms
  • Supports growing student population
  • Delivered with quality and cost-efficiency
  • Opened on time, under budget

Learn More

BHS_Bond22_OnePager (PDF)