Skip to main content

Bond 2022 Projects in Order of Completion Home

Completed Bond Projects

A modern school hallway with purple accents, featuring student artwork and seating areas.

BHS Addition

  • Expanded classroom capacity by 19,600 sq. ft./10 classrooms
  • Supports growing student population
  • Delivered with quality and cost-efficiency

Learn More About the BHS Addition

A bright, modern elementary school library with colorful seating and abundant bookshelves.

Viola Wilson Elementary

  • 97,151 square feet
  • Provides modern learning environments designed for collaboration, safety, and student success
  • Designed to meet campus needs as new families join our community

Learn More About Viola Wilson Elementary

Modern school building with glass walkways and a blue sky.

CHS Addition

  • 38,042 sq ft two-story facility
  • 10 Classrooms
  • 4 Computer Labs
  • 4 Flexible collaborative learning areas
  • Additional parking

A blue and green tennis court with a fence and trees in the background.

CHS Tennis Courts & Marching Pad

  • New tennis courts competition surface
  • Outdoor lighting at the band marching pad
  • Complete milling and pavement resurfacing
  • New painting and marking for marching band and parking spots

An outdoor amphitheater with tiered seating and a central performance area, surrounded by trees.

BHS Courtyard

  • New design
  • Improved drainage
  • Accessible paths
  • Additional outside seating areas
  • Amphitheater for learning and events
  • Updated lighting
  • New artificial turf, landscaping and fencing
  • Repair and reroute underground infrastructure
  • Supports student collaboration, flexible learning opportunities, and campus connectivity

Learn More About the BHS Courtyard

A modern elementary school library with colorful seating and bookshelves.

CCES Library

  • Open and collaborative concept
  • Adjacent improvements
  • Learning wall
  • Maker space
  • Learning steps
  • New furniture
  • New circulation desk
  • New librarian office and workroom

Learn More About the Cibolo Creek Elementary Libary

A modern elementary school library with colorful seating and interactive screens.

CES Library

  • Open and collaborative concept
  • Adjacent improvements
  • Learning wall
  • Maker space
  • Learning steps
  • New furniture
  • New circulation desk
  • New librarian office and workroom

Learn More About the Curington Elementary Library

A vibrant elementary school library with colorful seating and a large mural.

FORES Library

  • Open and collaborative concept
  • Adjacent improvements
  • Learning wall
  • Maker space
  • Learning steps
  • New furniture
  • New circulation desk
  • New librarian office and workroom

Learn More about the Fair Oaks Ranch Elementary Library

 

A modern elementary school library with colorful seating and bookshelves.

KES Library

  • Open and collaborative concept
  • Adjacent improvements
  • Learning wall
  • Maker space
  • Learning steps
  • New furniture
  • New circulation desk
  • New librarian office and workroom

Learn More About the Kendall Elementary Library

 

The George & Bedelia Mitchell Learning Center building entrance with a group of people gathered outside.

George & Baudelia Mitchell Learning Center

  • Renovated facility to support specialized student programs
  • 15,200 square feet
  • 6 classrooms
  • 2 collaborative spaces
  • Includes updated learning spaces, support areas, and improved functionality
  • Provides a supportive environment tailored to diverse student learning needs

Learn More About the Mitchell Learning Center

Aerial view of a football stadium with a track and bleachers.

BISD Stadium

  • New track and turf
  • Installation of visitor side bleachers

A row of bright yellow school buses parked outdoors.

Transportation

June 2023: Purchased 15 new buses with three-point seatbelts, air-conditioning, and automatic braking systems.

January 2025: Bond interest earnings were used to replace a white fleet vehicle for use transporting students and staff.

April 2025: Purchased 7 buses (route and shuttle) with bond interest earnings.

Two students work on an application problem displayed on an interactive whiteboard in a classroom.

Technology

  • Portable & hand-held devices for the students & staff at VWES, CHS, BHS, BMSS & BMSN
  • Refresh of devices at all other campuses

An outdoor swimming pool with starting blocks and lane lines under a clear sky.

Aquatics Learning Center

  • Swimming, water polo, diving, and learning environment
  • Parking for 50 cars, 4 buses
  • Pool equipment room
  • Modular building with public restrooms, two locker rooms, coaches office
  • Portable bleachers
  • Time clock and scoring system with digital display and PA announcing
  • Shade structures

Learn More About the Aquatics Learning Center

Aerial view of a large parcel of land outlined in blue, with a digital overlay showing property lines and a label.

Land Acquisition

More About Bond 2022

    • Boerne High School Addition
    • Viola Wilson Elementary
    • Champion High School Addition
    • Champion High School Tennis Courts, Marching Pad
    • Boerne High School Courtyard
    • George & Bedelia Mitchell Learning Center
    • Legacy Campus Libraries
    • Aquatics Learning Center
    • Kristi Schmidt

    • Susie Allen

    • Carlin Friar

    • Courtney Bruce

    • Dennis Smith

    • Ernie Pyles

    • Michael Glick

    • Charlie HIll

    • Rob Weller

    • Melanie Lee

    • Dr. Maggie Dominguez

    • Ramiro Guerrero

    • Sean Babcock

    • Wesley Scott

    • Dr. John O'Hare

    • Dr. Kristin Craft

Board Presentations

No Documents To Display